2021
Køge

Biomass boiler house with a thermal capacity of 50MW. Insulation and cladding for flue gas ducts and DH piping.

Status:

Completed

Power:

50 MW

2020
Køge ★ Case study

Biomass boiler house with a thermal capacity of 50MW. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms.

Status:

Completed

Power:

50 MW

2019
Randers

Flue gas treatment system. Installation of flue gas scrubber and secondary equipment installation. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Insulation and cladding for flue gas ducts, pipes and equipment.

Status:

Completed

2019
Nykøbing Falster

RDF boiler house with a thermal capacity of 40MW. Installation of flue gas scrubber and secondary equipment installation. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Insulation and cladding for flue gas ducts, pipes and equipment.

Status:

Completed

Power:

40 MW

Estonia

2023
Imavere

Biomass boiler house with a thermal capacity of 20 MW. Installation of electrostatic precipitators

Status:

Completed

Power:

20 MW

2019
Rummu
2019
Vaida

Biomass boiler house with a thermal capacity of 1.5MW. Installation of all technological equipment.

Status:

Completed

Power:

1.5 MW

2017
Pärnu

Installation of DH network DN150 1500m.

Status:

Completed

France

2023
Alizay

BFB CHP plant with a thermal capacity of 140MW and an electric capacity of 40MW. Flue gas condenser and technological equipment installation, including the design, manufacturing, and installation of steel structures, service platforms, ducts and piping systems.

Status:

In progress

Power:

140 MW (thermal)
40 MW (electrical)

Germany

2015
Lippendorf

CHP plant with thermal capacity of 300MW and electric capacity of 2x934MW. Dismantle and installation of turbines.

Status:

Completed

Power:

300 MW (thermal), 1868 MW (electrical)

Latvia

2023
Cēsis

Biomass boiler house with a thermal capacity of 1 MW. Installation of technological equipment.

Status:

Completed

Power:

1 MW

2023
Rīga

Biomass boiler house with a thermal capacity of 48 MW.  Design, production and delivery of two chimneys with a height of 44.6m and diameter ratio (D/d) of 1500/1200mm with ladders and platforms.

Status:

Completed

Power:

48 MW

2023
Mārupe

Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts.

Status:

Completed

Power:

1.8 MW

2020
Daugavpils

Biomass boiler house with a thermal capacity of 36MW. Installation of electrostatic precipitators.

Status:

Completed

Power:

36 MW

2020
Talsi

Biomass boiler house with a thermal capacity of 1MW. Installation of all technological equipment.

Status:

Completed

Power:

1 MW

2018
Ventspils

Biomass boiler house with a thermal capacity of 20MW. Installation of flue gas condenser and secondary equipment. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Design, production and assembly of a chimney with a height of 25m. Insulation and cladding for flue gas ducts, pipes and equipment.

Status:

Completed

Power:

20 MW

2017
Rīga

Multi apartment building. Insulation of HVAC ducting.

Status:

Completed

2016
Vecpiebalga

Biomass boiler house with a thermal capacity of 1MW. Insulation and cladding for flue gas ducts.

Status:

Completed

Power:

1 MW

2015
Nīca

Arena for sports in Nīca. Insulation of HVAC ducting.

Status:

Completed

2015
Jēkabpils

Biomass boiler house with a thermal capacity of 3MW. Insulation and cladding for flue gas ducts.

Status:

Completed

Power:

3 MW

2014
Aizkraukle

Biomass boiler house with a thermal capacity of 10MW. Insulation and cladding for flue gas ducts, pipes and equipment.

Status:

Completed

Power:

10 MW

2014
Smiltene

CHP plant with thermal capacity of 3MW and electric capacity of 0.95MW. Insulation and cladding for flue gas ducts, pipes and equipment.

Status:

Completed

Power:

3 MW (thermal)
0.95 MW (electrical)

2014
Preiļi

CHP plant with thermal capacity of 5MW and electric capacity of 1.5MW. Insulation and cladding for flue gas ducts, pipes and equipment.

Status:

Completed

Power:

3 MW (thermal)
0.95 MW (electrical)

Lithuania

2024
Skaidiškės

Biomass boiler house with a thermal capacity of 2.5MW. Design, production and delivery of a chimney with a height of 28m and a diameter ratio (D/d) of 750/560mm.

Status:

In progress

Power:

2.5 MW

2016
Pravieniškės

Biomass boiler house with a thermal capacity of 4MW. Insulation and cladding for flue gas ducts.

Status:

Completed

Power:

4 MW

2014
Ukmergė

Biomass boiler house with a thermal capacity of 6.5MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.

Status:

Completed

Power:

6.5 MW

Norway

2022
Kirkenær ★ Case study

RDF boiler house with a thermal capacity of 7MW. Design and production of a stainless wet ash conveyor.

Status:

Completed

Power:

7 MW

2022
Kirkenær ★ Case study

RDF boiler house with a thermal capacity of 7MW. Design and production of service platforms and supports.

Status:

Completed

Power:

7 MW

2022
Kirkenær ★ Case study

RDF boiler house with a thermal capacity of 7MW. Design and production of container-type district heating system unit and loose pipe spools.

Status:

Completed

Power:

7 MW

2021
Hattfjelldal

Container-type biomass boiler house with a thermal capacity of 3 MW. Installation on site.

Status:

Completed

Power:

3 MW

Poland

2023
Świt

Biomass boiler house with a thermal capacity of 10 MW. Design, manufacturing, installation, and commissioning. Includes fuel delivery system, combustion technology, ash removal system, flue gas removal and purification system, boiler with dry economizer, fullautomation and SCADA system, and other secondary equipment.

Status:

Completed

Power:

10 MW

2021
Lublin ★ Case study

BFB CHP plant with a thermal capacity of 50MW and an electric capacity of 12MW. Design, production and assembly of a chimney with a height of 60m and a diameter ratio (D/d) of 2000/1800mm with service platforms.

Status:

Completed

Power:

50 MW (thermal)
12 MW (electrical)

Sweden

2023
Bollnas

Biomass boiler house with a thermal capacity of 5 MW. Design, manufacturing, installation, and commissioning. Includes fuel delivery system, combustion technology, boiler, ash removal system, flue gas removal and purification system, flue gas condensation, full automation and SCADA system, piping, water treatment, and other secondary equipment.

Status:

In Progress

Power:

5 MW

2023
Örnsköldsvik

Reconstruction of a BFB CHP plant with a thermal capacity of 130MW and an electric capacity of 40MW, including the dismantling of the existing chimney, measuring house, and staircase, followed by the designing, manufacturing, and assembly of a new chimney with a height of 69.48m and a diameter ratio (D/d) of 3300/3000mm, a measuring house, platforms, and staircase.

Status:

Completed

Power:

130 MW (thermal),
40 MW (electrical)

2023
Vaggeryd

Biomass boiler house with a thermal capacity of 2x6MW. Design and production of chain conveyors for ashes.

Status:

Production

Power:

12 MW

2023
Vaggeryd

Biomass boiler house with a thermal capacity of 2x6MW. Design of piping system according to PED 2014/68/EU.

Status:

Completed

Power:

12 MW

2022
Kungälv

Biomass boiler house with a thermal capacity of 10.5MW. Design of piping system according to PED 2014/68/EU. Production of container-type district heating system unit.

Status:

Completed

Power:

10.5 MW

2022
Knäred

Biomass boiler house with a thermal capacity of 3.5MW. Design of piping system according to PED 2014/68/EU. Production of container-type district heating system unit.

Status:

Completed

Power:

3.5 MW

2022
Kiruna

10MW flue gas condenser and technological equipment installation; including design, manufacturing and installation of service platforms, steel structures and supports.

Status:

Completed

Power:

10 MW

2021
Ljungby

Biomass boiler house with a thermal capacity of 6MW. Installation of all technological equipment.

Status:

Completed

Power:

6 MW