Year | Country | City | Status | Description |
---|---|---|---|---|
2024 | Lithuania | Skaidiškės | In progress | Biomass boiler house with a thermal capacity of 2.5MW. Design, production and delivery of a chimney with a height of 28m and a diameter ratio (D/d) of 750/560mm. |
2024 | Sweden | Umea | In progress | Biomass boiler houses with a thermal capacity of 60 MW. Reconstruction of the wet ash removal system, including two conveyors, a hydraulic gate shut-off valve system, automation, construction works, and other auxiliary systems. Design, manufacturing, and installation. |
2023 | Sweden | Nässjö | In progress | Biomass CHP plant with a 21MW and an electric capacity of 9MW. Reconstruction of the flue gas duct system, including the replacement of AISI316 D1400 and D1100 flue gas ducts, flue gas fans, flue gas dampers, silencers, automation, steel structures, and other auxiliary mechanisms. Design, manufacturing, and installation |
2023 | Sweden | Bollnas | In Progress | Biomass boiler house with a thermal capacity of 5 MW. Design, manufacturing, installation, and commissioning. Includes fuel delivery system, combustion technology, boiler, ash removal system, flue gas removal and purification system, flue gas condensation, full automation and SCADA system, piping, water treatment, and other secondary equipment. |
2023 | Latvia | Rīga | Completed | Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts and DH piping. |
2023 | Latvia | Cēsis | Completed | Biomass boiler house with a thermal capacity of 1 MW. Installation of technological equipment. |
2023 | Estonia | Imavere | Completed | Biomass boiler house with a thermal capacity of 20 MW. Installation of electrostatic precipitators |
2023 | France | Alizay | In progress | BFB CHP plant with a thermal capacity of 140MW and an electric capacity of 40MW. Flue gas condenser and technological equipment installation, including the design, manufacturing, and installation of steel structures, service platforms, ducts and piping systems. |
2023 | Latvia | Rīga | Completed | Biomass boiler house with a thermal capacity of 48 MW. Design, production and delivery of two chimneys with a height of 44.6m and diameter ratio (D/d) of 1500/1200mm with ladders and platforms. |
2023 | Poland | Świt | Completed | Biomass boiler house with a thermal capacity of 10 MW. Design, manufacturing, installation, and commissioning. Includes fuel delivery system, combustion technology, ash removal system, flue gas removal and purification system, boiler with dry economizer, fullautomation and SCADA system, and other secondary equipment. |
2023 | Latvia | Örnsköldsvik | Completed | Reconstruction of a BFB CHP plant with a thermal capacity of 130MW and an electric capacity of 40MW, including the dismantling of the existing chimney, measuring house, and staircase, followed by the designing, manufacturing, and assembly of a new chimney with a height of 69.48m and a diameter ratio (D/d) of 3300/3000mm, a measuring house, platforms, and staircase. |
2023 | Latvia | Rīga | Completed | Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts and DH piping. |
2023 | Latvia | Rīga | Completed | Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts and DH piping. |
2023 | Latvia | Mārupe | Completed | Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts. |
2023 | Sweden | Vaggeryd | Production | Biomass boiler house with a thermal capacity of 2x6 MW. Design and production of chain conveyors for ashes. |
2023 | Sweden | Vaggeryd | Completed | Biomass boiler house with a thermal capacity of 2x6 MW. Design of piping system according to PED 2014/68/EU. |
2022 | Sweden | Kungälv | Completed | Biomass boiler house with a thermal capacity of 10.5 MW. Design of piping system according to PED 2014/68/EU. Production of container-type district heating system unit. |
2022 | Sweden | Knäred | Completed | Biomass boiler house with a thermal capacity of 3.5 MW. Design of piping system according to PED 2014/68/EU. Production of container-type district heating system unit. |
2022 | Sweden | Vimmerby | Completed | Biomass boiler house with a thermal capacity of 8 MW. Design of piping system according to PED 2014/68/EU. |
2022 | Sweden | Kiruna | Completed | 10 MW flue gas condenser and technological equipment installation; including design, manufacturing and installation of service platforms, steel structures and supports. |
2022 | Estonia | Kuressaare | Completed | The reconstruction of a biomass boiler house with thermal capacity of 3.5 MW, including civil construction and designing, production, delivery, and installation of technological equipment. |
2022 | Latvia | Jelgava | Completed | Container-type biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for DH piping. |
2022 | Latvia | Jelgava | Completed | Container-type biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for flue gas ducts. |
2022 | Latvia | Jūrmala | Completed | Biomass boiler house with a thermal capacity of 5 MW. Design, production and assembly of a chimney with a height of 50m and a diameter ratio (D/d) of 1250/650mm. |
2022 | Denmark | Odense | Completed | BFB boiler plant with thermal capacity of 180 MW. Design and production of a quench for flue gas condensation and a NaOH tank. |
2021 | Denmark | Køge | Completed | Biomass boiler house with a thermal capacity of 50 MW. Insulation and cladding for flue gas ducts and DH piping. |
2022 | Norway | Kirkenær | Completed | RDF boiler house with a thermal capacity of 7 MW. Design and production of a stainless wet ash conveyor. |
2022 | Norway | Kirkenær | Completed | RDF boiler house with a thermal capacity of 7 MW. Design and production of service platforms and supports. |
2022 | Norway | Kirkenær | Completed | RDF boiler house with a thermal capacity of 7 MW. Design and production of container-type district heating system unit and loose pipe spools. |
2021 | Poland | Lublin | Completed | BFB CHP plant with a thermal capacity of 50 MW and an electric capacity of 12 MW. Design, production and assembly of a chimney with a height of 60m and a diameter ratio (D/d) of 2000/1800mm with service platforms. |
2021 | Norway | Hattfjelldal | Completed | Container-type biomass boiler house with a thermal capacity of 3 MW. Installation on site. |
2021 | Norway | Mo i Rana | Completed | Reconstruction of a biomass boiler house, including installation of a fuel storage with walking floors, fuel conveyors, fuel supply mechanisms. |
2021 | Latvia | Jelgava | Completed | Container-type biomass boiler house with a thermal capacity of 3.0 MW. Insulation and cladding for DH piping, flue gas ducts, and technological equipment. |
2021 | Latvia | Talsi | Completed | Reconstruction of biomass boiler house. Replacement existing platforms and fuel conveyors. |
2021 | Sweden | Gnosjö | Completed | Biomass boiler house with a thermal capacity of 3 MW. Installation of a fuel storage with walking floor and fuel conveyors. |
2021 | Sweden | Ljungby | Completed | Biomass boiler house with a thermal capacity of 6 MW. Installation of all technological equipment. |
2020 | Latvia | Daugavpils | Completed | Biomass boiler house with a thermal capacity of 36 MW. Installation of electrostatic precipitators. |
2020 | Latvia | Madona | Completed | Biomass boiler house with a thermal capacity of 6 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. |
2020 | Belarus | Vitebsk | Completed | Reconstruction of a biomass boiler house with a thermal capacity of 8 MW. Modernization of DH piping system, control cabinets, and automatics. Repairs of the furnace masonry. Combustion process adjustments on different fuels. |
2020 | Latvia | Talsi | Completed | Modernization of a sorting saw line. |
2020 | Latvia | Rīga | Completed | Supply of gas valves DN700 - 100mm and actuators. |
2020 | Latvia | Rīga | Completed | Supply of gas pipes DN700 and fittings. |
2020 | Latvia | Ventspils | Completed | Biomass boiler house. Design and production of screw conveyors for ash transportation. |
2020 | Finland | Lahti | Completed | Biomass boiler house with a thermal capacity of 8 MW. Design, production and assembly of a chimney with a height of 35m and a diameter ratio (D/d) of 2400/(900/750)mm with service platforms. |
2020 | Estonia | Alu | Completed | Biomass boiler house. Design of flue gas ducts and steel supports. |
2020 | Latvia | Rīga | Completed | Supply of gas valves DN700 - 400mm and actuators. |
2020 | Denmark | Koge | Completed | Biomass boiler house with a thermal capacity of 50 MW. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. |
2020 | Latvia | Valdemārpils | Completed | Biomass boiler house with a thermal capacity of 1.5 MW. Design, production and installation of flue gas ducts, a chimney and steel supports. Insulation and cladding for flue gas ducts. |
2020 | Latvia | Talsi | Completed | Biomass boiler house with a thermal capacity of 1 MW. Installation of all technological equipment. |
2019 | Lithuania | Akmenė | Completed | Biomass boiler house with a thermal capacity of 44.2 MW. Installation of technological equipment. |
2019 | Estonia | Rummu | Completed | Biomass boiler house. Design, production and assembly of a chimney with a height of 17m and a diameter ratio (D/d) of 1250/(450/400)mm. |
2019 | Latvia | Usma | Completed | Reconstruction of a biomass boiler house with a thermal capacity of 1 MW. |
2019 | Estonia | Vaida | Completed | Biomass boiler house with a thermal capacity of 1.5 MW. Installation of all technological equipment. |
2019 | Estonia | Vara | Completed | Biomass boiler house. Design, production and assembly of a chimney with a height of 44m and a diameter ratio (D/d) of 1200/(1000)mm. |
2019 | Latvia | Ozoli | Completed | Biomass boiler house with a thermal capacity of 1.2 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. |
2019 | Latvia | Kusa | Completed | Biomass boiler house with a thermal capacity of 1.5 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. Design, production and assembly of a chimney with a height of 15m and a diameter ratio (D/d) of 850/(650)mm. |
2019 | Latvia | Barkava | Completed | Biomass boiler house with a thermal capacity of 1 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. |
2019 | Denmark | Randers | Completed | Flue gas treatment system. Installation of flue gas scrubber and secondary equipment installation. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Insulation and cladding for flue gas ducts, pipes and equipment. |
2019 | Denmark | Nykøbing Falster | Completed | RDF boiler house with a thermal capacity of 40 MW. Installation of flue gas scrubber and secondary equipment installation. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Insulation and cladding for flue gas ducts, pipes and equipment. |
2018 | Latvia | Ventspils | Completed | Biomass boiler house with a thermal capacity of 20 MW. Installation of flue gas condenser and secondary equipment. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Design, production and assembly of a chimney with a height of 25m. Insulation and cladding for flue gas ducts, pipes and equipment. |
2018 | Latvia | Dzelzava | Completed | Biomass boiler house with a thermal capacity of 1.2 MW. Design, production and installation of fuel supply system and automatization. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. |
2018 | Estonia | Võru | Completed | Biomass boiler house with a thermal capacity of 15 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. |
2018 | Latvia | Ventava | Completed | Biomass boiler house with a thermal capacity of 1 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. Design, production and assembly of a chimney with a height of 16m. |
2018 | Latvia | Užava | Completed | Biomass boiler house with a thermal capacity of 1 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. |
2017 | Estonia | Pärnu | Completed | Installation of DH network DN150 1500m. |
2017 | Latvia | Rīga | Completed | Multi apartment building. Insulation of HVAC ducting. |
2016 | Latvia | Vecpiebalga | Completed | Biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for flue gas ducts. |
2016 | Estonia | Pärnu | Completed | Biomass boiler house with a thermal capacity of 6.5 MW. Insulation and cladding for flue gas ducts. |
2016 | Lithuania | Pravieniškės | Completed | Biomass boiler house with a thermal capacity of 4 MW. Insulation and cladding for flue gas ducts. |
2016 | Latvia | Ugāle | Completed | Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts. |
2015 | Latvia | Nīca | Completed | Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts. |
2015 | Latvia | Nīca | Completed | Arena for sports in Nīca. Insulation of HVAC ducting. |
2015 | Latvia | Līvani | Completed | Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts. |
2015 | Latvia | Jēkabpils | Completed | Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts. |
2015 | Latvia | Grobiņa | Completed | Biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for flue gas ducts. |
2015 | Lithuania | Klaipėda | Completed | Biomass thermal oil boiler house with a thermal capacity of 12 MW. Insulation and cladding for flue gas ducts, pipes and equipment. |
2015 | Germany | Düsseldorf | Completed | Messe Düsseldorf, HVAC system reconstruction. Insulation of HVAC ducting. |
2015 | Germany | Lippendorf | Completed | CHP plant with thermal capacity of 300 MW and electric capacity of 2x934 MW. Dismantle and installation of turbines. |
2014 | Latvia | Aizkraukle | Completed | Biomass boiler house with a thermal capacity of 10 MW. Insulation and cladding for flue gas ducts, pipes and equipment. |
2014 | Latvia | Liepāja | Completed | Oil product storage and handling terminal. Insulation and cladding for the tanks of V-2000 m3 and V-3000 m3. |
2014 | Lithuania | Ukmergė | Completed | Biomass boiler house with a thermal capacity of 6.5 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. |
2014 | Latvia | Smiltene | Completed | CHP plant with thermal capacity of 3 MW and electric capacity of 0.95 MW. Insulation and cladding for flue gas ducts, pipes and equipment. |
2014 | Latvia | Preiļi | Completed | CHP plant with thermal capacity of 5 MW and electric capacity of 1.5 MW. Insulation and cladding for flue gas ducts, pipes and equipment. |
High-quality and efficient services that are tailored to your specific requirements are delivered by us.
Is your industrial system struggling to keep up with new regulations or process efficiency?
Are you searching for an experienced partner to handle your industrial system needs?
Looking for a reliable and innovative organization to provide tailored solutions that contribute to a sustainable future?
Assembling and Installation is carried out by our qualified and experienced specialists and this fact guarantees assembly quality and on time commissioning.
We pride ourselves on delivering unparalleled results through our turn-key completion of projects. Led by a dedicated team of professional engineers, we expertly navigate the complexities of industrial engineering to bring your projects to successful fruition, no matter the scope or challenge.