References

Year Country City Status Description
2024 Lithuania Skaidiškės In progress Biomass boiler house with a thermal capacity of 2.5MW. Design, production and delivery of a chimney with a height of 28m and a diameter ratio (D/d) of 750/560mm.
2024 Sweden Umea In progress Biomass boiler houses with a thermal capacity of 60 MW. Reconstruction of the wet ash removal system, including two conveyors, a hydraulic gate shut-off valve system, automation, construction works, and other auxiliary systems. Design, manufacturing, and installation.
2023 Sweden Nässjö In progress Biomass CHP plant with a 21MW and an electric capacity of 9MW. Reconstruction of the flue gas duct system, including the replacement of AISI316 D1400 and D1100 flue gas ducts, flue gas fans, flue gas dampers, silencers, automation, steel structures, and other auxiliary mechanisms. Design, manufacturing, and installation
2023 Sweden Bollnas In Progress Biomass boiler house with a thermal capacity of 5 MW. Design, manufacturing, installation, and commissioning. Includes fuel delivery system, combustion technology, boiler, ash removal system, flue gas removal and purification system, flue gas condensation, full automation and SCADA system, piping, water treatment, and other secondary equipment.
2023 Latvia Rīga Completed Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts and DH piping.
2023 Latvia Cēsis Completed Biomass boiler house with a thermal capacity of 1 MW. Installation of technological equipment.
2023 Estonia Imavere Completed Biomass boiler house with a thermal capacity of 20 MW. Installation of electrostatic precipitators
2023 France Alizay In progress BFB CHP plant with a thermal capacity of 140MW and an electric capacity of 40MW. Flue gas condenser and technological equipment installation, including the design, manufacturing, and installation of steel structures, service platforms, ducts and piping systems.
2023 Latvia Rīga Completed Biomass boiler house with a thermal capacity of 48 MW. Design, production and delivery of two chimneys with a height of 44.6m and diameter ratio (D/d) of 1500/1200mm with ladders and platforms.
2023 Poland Świt Completed Biomass boiler house with a thermal capacity of 10 MW. Design, manufacturing, installation, and commissioning. Includes fuel delivery system, combustion technology, ash removal system, flue gas removal and purification system, boiler with dry economizer, fullautomation and SCADA system, and other secondary equipment.
2023 Latvia Örnsköldsvik Completed Reconstruction of a BFB CHP plant with a thermal capacity of 130MW and an electric capacity of 40MW, including the dismantling of the existing chimney, measuring house, and staircase, followed by the designing, manufacturing, and assembly of a new chimney with a height of 69.48m and a diameter ratio (D/d) of 3300/3000mm, a measuring house, platforms, and staircase.
2023 Latvia Rīga Completed Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts and DH piping.
2023 Latvia Rīga Completed Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts and DH piping.
2023 Latvia Mārupe Completed Container-type biomass boiler house with a thermal capacity of 1.8 MW. Insulation and cladding for flue gas ducts.
2023 Sweden Vaggeryd Production Biomass boiler house with a thermal capacity of 2x6 MW. Design and production of chain conveyors for ashes.
2023 Sweden Vaggeryd Completed Biomass boiler house with a thermal capacity of 2x6 MW. Design of piping system according to PED 2014/68/EU.
2022 Sweden Kungälv Completed Biomass boiler house with a thermal capacity of 10.5 MW. Design of piping system according to PED 2014/68/EU. Production of container-type district heating system unit.
2022 Sweden Knäred Completed Biomass boiler house with a thermal capacity of 3.5 MW. Design of piping system according to PED 2014/68/EU. Production of container-type district heating system unit.
2022 Sweden Vimmerby Completed Biomass boiler house with a thermal capacity of 8 MW. Design of piping system according to PED 2014/68/EU.
2022 Sweden Kiruna Completed 10 MW flue gas condenser and technological equipment installation; including design, manufacturing and installation of service platforms, steel structures and supports.
2022 Estonia Kuressaare Completed The reconstruction of a biomass boiler house with thermal capacity of 3.5 MW, including civil construction and designing, production, delivery, and installation of technological equipment.
2022 Latvia Jelgava Completed Container-type biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for DH piping.
2022 Latvia Jelgava Completed Container-type biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for flue gas ducts.
2022 Latvia Jūrmala Completed Biomass boiler house with a thermal capacity of 5 MW. Design, production and assembly of a chimney with a height of 50m and a diameter ratio (D/d) of 1250/650mm.
2022 Denmark Odense Completed BFB boiler plant with thermal capacity of 180 MW. Design and production of a quench for flue gas condensation and a NaOH tank.
2021 Denmark Køge Completed Biomass boiler house with a thermal capacity of 50 MW. Insulation and cladding for flue gas ducts and DH piping.
2022 Norway Kirkenær Completed RDF boiler house with a thermal capacity of 7 MW. Design and production of a stainless wet ash conveyor.
2022 Norway Kirkenær Completed RDF boiler house with a thermal capacity of 7 MW. Design and production of service platforms and supports.
2022 Norway Kirkenær Completed RDF boiler house with a thermal capacity of 7 MW. Design and production of container-type district heating system unit and loose pipe spools.
2021 Poland Lublin Completed BFB CHP plant with a thermal capacity of 50 MW and an electric capacity of 12 MW. Design, production and assembly of a chimney with a height of 60m and a diameter ratio (D/d) of 2000/1800mm with service platforms.
2021 Norway Hattfjelldal Completed Container-type biomass boiler house with a thermal capacity of 3 MW. Installation on site.
2021 Norway Mo i Rana Completed Reconstruction of a biomass boiler house, including installation of a fuel storage with walking floors, fuel conveyors, fuel supply mechanisms.
2021 Latvia Jelgava Completed Container-type biomass boiler house with a thermal capacity of 3.0 MW. Insulation and cladding for DH piping, flue gas ducts, and technological equipment.
2021 Latvia Talsi Completed Reconstruction of biomass boiler house. Replacement existing platforms and fuel conveyors.
2021 Sweden Gnosjö Completed Biomass boiler house with a thermal capacity of 3 MW. Installation of a fuel storage with walking floor and fuel conveyors.
2021 Sweden Ljungby Completed Biomass boiler house with a thermal capacity of 6 MW. Installation of all technological equipment.
2020 Latvia Daugavpils Completed Biomass boiler house with a thermal capacity of 36 MW. Installation of electrostatic precipitators.
2020 Latvia Madona Completed Biomass boiler house with a thermal capacity of 6 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.
2020 Belarus Vitebsk Completed Reconstruction of a biomass boiler house with a thermal capacity of 8 MW. Modernization of DH piping system, control cabinets, and automatics. Repairs of the furnace masonry. Combustion process adjustments on different fuels.
2020 Latvia Talsi Completed Modernization of a sorting saw line.
2020 Latvia Rīga Completed Supply of gas valves DN700 - 100mm and actuators.
2020 Latvia Rīga Completed Supply of gas pipes DN700 and fittings.
2020 Latvia Ventspils Completed Biomass boiler house. Design and production of screw conveyors for ash transportation.
2020 Finland Lahti Completed Biomass boiler house with a thermal capacity of 8 MW. Design, production and assembly of a chimney with a height of 35m and a diameter ratio (D/d) of 2400/(900/750)mm with service platforms.
2020 Estonia Alu Completed Biomass boiler house. Design of flue gas ducts and steel supports.
2020 Latvia Rīga Completed Supply of gas valves DN700 - 400mm and actuators.
2020 Denmark Koge Completed Biomass boiler house with a thermal capacity of 50 MW. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms.
2020 Latvia Valdemārpils Completed Biomass boiler house with a thermal capacity of 1.5 MW. Design, production and installation of flue gas ducts, a chimney and steel supports. Insulation and cladding for flue gas ducts.
2020 Latvia Talsi Completed Biomass boiler house with a thermal capacity of 1 MW. Installation of all technological equipment.
2019 Lithuania Akmenė Completed Biomass boiler house with a thermal capacity of 44.2 MW. Installation of technological equipment.
2019 Estonia Rummu Completed Biomass boiler house. Design, production and assembly of a chimney with a height of 17m and a diameter ratio (D/d) of 1250/(450/400)mm.
2019 Latvia Usma Completed Reconstruction of a biomass boiler house with a thermal capacity of 1 MW.
2019 Estonia Vaida Completed Biomass boiler house with a thermal capacity of 1.5 MW. Installation of all technological equipment.
2019 Estonia Vara Completed Biomass boiler house. Design, production and assembly of a chimney with a height of 44m and a diameter ratio (D/d) of 1200/(1000)mm.
2019 Latvia Ozoli Completed Biomass boiler house with a thermal capacity of 1.2 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.
2019 Latvia Kusa Completed Biomass boiler house with a thermal capacity of 1.5 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. Design, production and assembly of a chimney with a height of 15m and a diameter ratio (D/d) of 850/(650)mm.
2019 Latvia Barkava Completed Biomass boiler house with a thermal capacity of 1 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.
2019 Denmark Randers Completed Flue gas treatment system. Installation of flue gas scrubber and secondary equipment installation. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Insulation and cladding for flue gas ducts, pipes and equipment.
2019 Denmark Nykøbing Falster Completed RDF boiler house with a thermal capacity of 40 MW. Installation of flue gas scrubber and secondary equipment installation. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Insulation and cladding for flue gas ducts, pipes and equipment.
2018 Latvia Ventspils Completed Biomass boiler house with a thermal capacity of 20 MW. Installation of flue gas condenser and secondary equipment. Design, production, and installation of flue gas ducts, steel structures, supports and service platforms. Design, production and assembly of a chimney with a height of 25m. Insulation and cladding for flue gas ducts, pipes and equipment.
2018 Latvia Dzelzava Completed Biomass boiler house with a thermal capacity of 1.2 MW. Design, production and installation of fuel supply system and automatization. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.
2018 Estonia Võru Completed Biomass boiler house with a thermal capacity of 15 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.
2018 Latvia Ventava Completed Biomass boiler house with a thermal capacity of 1 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts. Design, production and assembly of a chimney with a height of 16m.
2018 Latvia Užava Completed Biomass boiler house with a thermal capacity of 1 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.
2017 Estonia Pärnu Completed Installation of DH network DN150 1500m.
2017 Latvia Rīga Completed Multi apartment building. Insulation of HVAC ducting.
2016 Latvia Vecpiebalga Completed Biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for flue gas ducts.
2016 Estonia Pärnu Completed Biomass boiler house with a thermal capacity of 6.5 MW. Insulation and cladding for flue gas ducts.
2016 Lithuania Pravieniškės Completed Biomass boiler house with a thermal capacity of 4 MW. Insulation and cladding for flue gas ducts.
2016 Latvia Ugāle Completed Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts.
2015 Latvia Nīca Completed Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts.
2015 Latvia Nīca Completed Arena for sports in Nīca. Insulation of HVAC ducting.
2015 Latvia Līvani Completed Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts.
2015 Latvia Jēkabpils Completed Biomass boiler house with a thermal capacity of 3 MW. Insulation and cladding for flue gas ducts.
2015 Latvia Grobiņa Completed Biomass boiler house with a thermal capacity of 1 MW. Insulation and cladding for flue gas ducts.
2015 Lithuania Klaipėda Completed Biomass thermal oil boiler house with a thermal capacity of 12 MW. Insulation and cladding for flue gas ducts, pipes and equipment.
2015 Germany Düsseldorf Completed Messe Düsseldorf, HVAC system reconstruction. Insulation of HVAC ducting.
2015 Germany Lippendorf Completed CHP plant with thermal capacity of 300 MW and electric capacity of 2x934 MW. Dismantle and installation of turbines.
2014 Latvia Aizkraukle Completed Biomass boiler house with a thermal capacity of 10 MW. Insulation and cladding for flue gas ducts, pipes and equipment.
2014 Latvia Liepāja Completed Oil product storage and handling terminal. Insulation and cladding for the tanks of V-2000 m3 and V-3000 m3.
2014 Lithuania Ukmergė Completed Biomass boiler house with a thermal capacity of 6.5 MW. Design, production and installation of flue gas ducts and steel supports. Insulation and cladding for flue gas ducts.
2014 Latvia Smiltene Completed CHP plant with thermal capacity of 3 MW and electric capacity of 0.95 MW. Insulation and cladding for flue gas ducts, pipes and equipment.
2014 Latvia Preiļi Completed CHP plant with thermal capacity of 5 MW and electric capacity of 1.5 MW. Insulation and cladding for flue gas ducts, pipes and equipment.
Nothing found
Project Map

Over 70 Completed Projects

Assembling and Installation is carried out by our qualified and experienced specialists and this fact guarantees assembly quality and on time commissioning.

IN PARTNERSHIP WITH THE INDUSTRY LEADERS
OVER 50+ brands