Year Country City Description Photo
2022 Sweden Kiruna Flue gas condenser and technological equipment installation. Service platform designing and production according to the EN norms, and delivery.
 
2022 Estonia Kuressaare 3MW Biomass boiler house. EPC contract, including civil construction works, technological equipment designing, production, delivery, and installation.
 
2022 Denmark Odense 50MW Cogeneration plant. Quench and NaOH tankk design, certification, production and delivery.
 
2021 Denmark Koge 50MW Biomass boiler house. Piping insulation and cladding.
 
2021 Norway Krikenaer 8MW RDF cogeneration plant. Wet ash conveyor production and delivery.
 
2021 Norway Krikenaer 8MW RDF cogeneration plant. Service platform designing and production according to the EN norms, and delivery.
 
2021 Norway Krikenaer 8MW RDF cogeneration plant. Container-type district heating system and loose pipe spool designing, prefabrication, and delivery, including insulation and cladding.
 
2021 Poland Lublin 40MW Cogeneration plant. Free standing chimney delivery and installation. H=60m; D=1800mm.
 
2021 Norway Hattfjelldal 3MW Biomass boiler house. Conteiner type biomass boilerhouse installation.
 
2021 Norway Mo i Rana Boiler house reconstruction from fossil biomass fuel. Technological equipment installation, including fuel storage with walking floor, fuel conveyors, fuel supply mechanism.
 
2021 Latvia Jelgava 3MW Biomass boiler house. Technological equipment and piping insulation and cladding.
 
2021 Latvia Talsi Sawmill. Existing technological equipment dismantle and replacement, including fuel conveyors and service platforms.
 
2021 Sweden Gnosjo 3MW Biomass boiler house. Technological equipment installation, including fuel storage with walking floor, fuel conveyors.
 
2021 Sweden Ljungby 6MW Biomass boiler house. Technological equipment installation, including fuel storage with walking floor, fuel conveyors, fuel supply mechanism, moving grate furnace, boiler, multi-cyclone, ash conveyors, flue gas ducts, insulation, and cladding.
 
2020 Latvia Daugavpils 36MW Biomass boilerhouse. Electrostatic filter delivery and installation – 2pcs.
 
2020 Latvia Madona 6MW Biomass boilerhouse. Flue gas ducts, flue gas damper and steel support design,manufacturing, delivery, equipment installation and insulation.
 
2020 Belarus Vitebsk 8MW Biomass boilerhouse. Serviss maintenance, repair works including furnace brickworks. Modernization of DH piping system. Combustion process adjustment on different fuels.
 
2020 Latvia Talsi Modernization of the sorting saw line.
 
2020 Latvia Riga Gas valves DN700 – 100mm and actuators supply.
 
2020 Latvia Riga Gas pipeline DN700mm and fittings supply.
 
2020 Latvia Ventspils Ash screw conveyors design, manufacturing, and delivery.  
2020 Finland Lahti Free standing chimney delivery and installation H=35m; D=2620mm.
 
2020 Estonia Rapla Biomass boilerhouses. Flue gas ducts design and workshop drawings.
 
2020 Latvia Riga Gas valves DN700 – 400mm and actuators supply.
 
2020 Denmark Koge 50MW Biomass boilerhouse. Flue gas ducts (S235JR / AISI316L /254_SMO ) and steel structures design, production, delivery, and installation.
 
2020 Latvia Valdemarpils 1,5MW Biomass boilerhouse. Flue gas ducts, chimney design, production, delivery, equipment installation.
 
2020 Latvia Talsi 1MW Biomass boilerhouse. Equipment installation.
 
2019 Lithuania Akmene 40 MW Biomass thermal oil plant technological equipment installation.
 
2019 Estonia Rummu Delivery, installation of free standing chimney H = 17m
 
2019 Latvia Talsi 1MW Biomass boiler house. Technological equipment installation, water piping installation, industrial insulation, automation, electrical and low woltage cabeling, start up.
 
2019 Estonia Vaida 1.5MW Biomass boiler house. Technological equipment installation, water piping installation, industrial insulation.
 
2019 Estonia Tartu Delivery, installation of free standing chimney H = 44m.
 
2019 Latvia Ozoli 2.5MW Biomass boilerhouse. Flue gas ducts design, production, assembly. Delivery, installation of free standing chimney H = 15m. Industrial insulation.
 
2019 Latvia Kusa 1.2MW Biomass boilerhouse. Flue gas ducts design, production, assembly. Industrial insulation.
 
2019 Latvia Barkava 1.5MW Biomass boilerhouse. Flue gas ducts design, production, assembly. Industrial insulation.
 
2019 Denmark Randers Flue gas cleaning system. Scrubber, smoke pump, pump and other main equipment assembly, hot deep galvanized service stairs and platform and steel structure design, manufacture, assembly, flue gas ducts DN2300-700 design, production, delivery, industrial insulation.
 
2019 Denmark Nykøbing Falster 40 MW RDF Biomass boiler house. Installation of condensing economizer, water piping DN400 and other main equipment, service platform production, assembly, flue gas ducts DN1800-350 production, assembly, industrial insulation.
 
2018 Latvia Ventspils 20 MW Biomass boiler house. Delivery of condensing economizer, free-standing H = 25m chimney, flue gas ducts DN900-600 and other Equipment delivery, installation of solid steel coating. Project management. Keystady
 
2018 Latvia Dzelzava 1.5 MW Biomass boiler house. Fuel delivery system, production, assembly, automation. Flue gas ducts, design, delivery, installation, industrial insulation.
 
2018 Estonia Voru 15MW Biomass boiler plant. Duct DN1200;1000;800 manufacturing, delivery and installation. Insulation works with solid steel coating.
 
2018 Estonia Tallin 15MW Biomass boiler plant. Duct DN1000; 800 manufacturing, delivery and installation.
 
2018 Latvia Ventava 1.2MW Biomass boiler house. Freestanding chimney H = 16m, chimney production, supply, industrial insulation.
 
2018 Latvia Užava 1MW Biomass boiler house. Freestanding chimney H = 21m, chimney installation, industrial insulation.
 
2017 Estonia Parnu Piping heating line DN160 1500m.

 

2017 Latvia Riga Civil buildings on Jeruzalemes Street, thermal insulation of ventilation ducts.

 

2016 Latvia Vecpiebalga 1MW Biomass boiler house. Flue gas ducts and pipeline industrial insulation.

 

2016 Estonia Parnu 5MW Biomass boiler house. Ducts and pipeline industrial insulation.
 
2016 Lithuania Pravieniskes 4MW Biomass boiler house. Ducts and pipeline industrial insulation.

 

2016 Latvia Ugale 3MW Biomass boiler house. Ducts and pipeline industrial insulation.
 
2015 Latvia Nica 3MW Biomass boiler house. Ducts and pipeline industrial insulation.
 
2015 Latvia Nica “Nīca Sports Hall”. Ventilation pipe insulation works.

 

2015 Latvia Livani 3MW Biomass boiler house. Ducts and pipeline industrial insulation.
 
2015 Latvia Jekabpils 3MW Biomass boiler house. Ducts and pipeline industrial insulation.

 

2015 Latvia Grobiņa 1MW Biomass boiler house. Ducts and pipeline industrial insulation.
 
2015 Lithuania Klaipeda 12MW Thermal oil biomass boiler house. Piping, equipment, flue gas ducts industrial insulation.

 

2015 Germany Düsseldorf Messe Düsseldorf, ventilation unit reconstruction, new building. Ventilation shaft insulation.
 
2015 Germany Lippendorf TEC 2x934MW electricity and 300MW heat. Turbine body dismantling, assembly works, industrial insulation
 
2014 Latvia Aizkraukle 10MW Biomass boiler house. Pipeline, equipment, Ducts industrial insulation

 

2014 Latvia Liepaja Oil product storage and handling terminal. V-2000 m3 and V-3000 m3 heat insulation works with corrugated met. sheets.
 
2014 Lithuania Ukmerge 6,5 MW  Biomass boiler house. Flue gas ducts design, production, assembly. Pipeline, equipment, ducts industrial insulation
 
2014 Latvia Smiltene Cogeneration plant 3MW heat and 0.95MWelectricity. Pipeline, equipment, ducts industrial insulation

 

2014 Latvia Preiļi Cogeneration plant 5MW thermal and 1.5MW electricity. Pipeline, equipment, ducts industrial insulation