Projects

Year Country City Description Photo
2020 Latvia Daugavpils 36MW Biomass boilerhouse. Electrostatic filter delivery and installation – 2pcs.
2020 Latvia Madona 6MW Biomass boilerhouse. Flue gas ducts, flue gas damper and steel support design,manufacturing, delivery, equipment installation and insulation.
2020 Belarus Vitebsk 8MW Biomass boilerhouse. Serviss maintenance, repair works including furnace brickworks. Modernization of DH piping system. Combustion process adjustment on different fuels.
2020 Latvia Talsi Modernization of the sorting saw line.
2020 Latvia Riga Gas valves DN700 – 100mm and actuators supply.
2020 Latvia Riga Gas pipeline DN700mm and fittings supply.
2020 Latvia Ventspils Ash screw conveyors design, manufacturing, and delivery.
2020 Finland Lahti Free standing chimney delivery and installation H=35m; D=2620mm.
2020 Estonia Rapla Biomass boilerhouses. Flue gas ducts design and workshop drawings.
2020 Latvia Riga Gas valves DN700 – 400mm and actuators supply.
2020 Denmark Koge 50MW Biomass boilerhouse. Flue gas ducts (S235JR / AISI316L /254_SMO ) and steel structures design, production, delivery, and installation.
2020 Latvia Valdemarpils 1,5MW Biomass boilerhouse. Flue gas ducts, chimney design, production, delivery, equipment installation.
2020 Latvia Talsi 1MW Biomass boilerhouse. Equipment installation.
2019 Lithuania Akmene 40 MW Biomass thermal oil plant technological equipment installation.
2019 Estonia Rummu Delivery, installation of free standing chimney H = 17m
2019 Latvia Talsi 1MW Biomass boiler house. Technological equipment installation, water piping installation, industrial insulation, automation, electrical and low woltage cabeling, start up.
2019 Estonia Vaida 1.5MW Biomass boiler house. Technological equipment installation, water piping installation, industrial insulation.
2019 Estonia Tartu Delivery, installation of free standing chimney H = 44m.
2019 Latvia Ozoli 2.5MW Biomass boilerhouse. Flue gas ducts design, production, assembly. Delivery, installation of free standing chimney H = 15m. Industrial insulation.
2019 Latvia Kusa 1.2MW Biomass boilerhouse. Flue gas ducts design, production, assembly. Industrial insulation.
2019 Latvia Barkava 1.5MW Biomass boilerhouse. Flue gas ducts design, production, assembly. Industrial insulation.
2019 Denmark Randers Flue gas cleaning system. Scrubber, smoke pump, pump and other main equipment assembly, hot deep galvanized service stairs and platform and steel structure design, manufacture, assembly, flue gas ducts DN2300-700 design, production, delivery, industrial insulation.
2019 Denmark Nykøbing Falster 40 MW RDF Biomass boiler house. Installation of condensing economizer, water piping DN400 and other main equipment, service platform production, assembly, flue gas ducts DN1800-350 production, assembly, industrial insulation.
2018 Latvia Ventspils 20 MW Biomass boiler house. Delivery of condensing economizer, free-standing H = 25m chimney, flue gas ducts DN900-600 and other Equipment delivery, installation of solid steel coating. Project management. Keystady
2018 Latvia Dzelzava 1.5 MW Biomass boiler house. Fuel delivery system, production, assembly, automation. Flue gas ducts, design, delivery, installation, industrial insulation.
2018 Estonia Voru 15MW Biomass boiler plant. Duct DN1200;1000;800 manufacturing, delivery and installation. Insulation works with solid steel coating.
2018 Estonia Tallin 15MW Biomass boiler plant. Duct DN1000; 800 manufacturing, delivery and installation.
2018 Latvia Ventava 1.2MW Biomass boiler house. Freestanding chimney H = 16m, chimney production, supply, industrial insulation.
2018 Latvia Užava 1MW Biomass boiler house. Freestanding chimney H = 21m, chimney installation, industrial insulation.
2017 Estonia Parnu Piping heating line DN160 1500m.

2017 Latvia Riga Civil buildings on Jeruzalemes Street, thermal insulation of ventilation ducts.

2016 Latvia Vecpiebalga 1MW Biomass boiler house. Flue gas ducts and pipeline industrial insulation.

2016 Estonia Parnu 5MW Biomass boiler house. Ducts and pipeline industrial insulation.
2016 Lithuania Pravieniskes 4MW Biomass boiler house. Ducts and pipeline industrial insulation.

2016 Latvia Ugale 3MW Biomass boiler house. Ducts and pipeline industrial insulation.
2015 Latvia Nica 3MW Biomass boiler house. Ducts and pipeline industrial insulation.
2015 Latvia Nica “Nīca Sports Hall”. Ventilation pipe insulation works.

2015 Latvia Livani 3MW Biomass boiler house. Ducts and pipeline industrial insulation.
2015 Latvia Jekabpils 3MW Biomass boiler house. Ducts and pipeline industrial insulation.

2015 Latvia Grobiņa 1MW Biomass boiler house. Ducts and pipeline industrial insulation.
2015 Lithuania Klaipeda 12MW Thermal oil biomass boiler house. Piping, equipment, flue gas ducts industrial insulation.

2015 Germany Düsseldorf Messe Düsseldorf, ventilation unit reconstruction, new building. Ventilation shaft insulation.
2015 Germany Lippendorf TEC 2x934MW electricity and 300MW heat. Turbine body dismantling, assembly works, industrial insulation
2014 Latvia Aizkraukle 10MW Biomass boiler house. Pipeline, equipment, Ducts industrial insulation

2014 Latvia Liepaja Oil product storage and handling terminal. V-2000 m3 and V-3000 m3 heat insulation works with corrugated met. sheets.
2014 Lithuania Ukmerge 6,5 MW  Biomass boiler house. Flue gas ducts design, production, assembly. Pipeline, equipment, ducts industrial insulation
2014 Latvia Smiltene Cogeneration plant 3MW heat and 0.95MWelectricity. Pipeline, equipment, ducts industrial insulation

2014 Latvia Preiļi Cogeneration plant 5MW thermal and 1.5MW electricity. Pipeline, equipment, ducts industrial insulation