SIA ENERTEK has been appointed as the sub supplier for delivering parts for a 50MW thermal capacity biomass boiler house in Køge, Denmark.

Complex boiler house component production and delivery

The production and delivery of several essential components, such as building steel construction with a special fireproof coating, the staircase construction, and heavy equipment steel support construction, were ensured.

Image: 3D design of the project.

High quality and safety standards

Moreover, a quench for the flue gas scrubber, as well as stainless steel flue gas ducts, were designed, produced, and delivered.

These components were specifically designed to meet quality and safety standards, ensuring the safe operation of the boiler house and cleaner air around the facility.

Read more about our certificates

Image: Installed platforms and flue gas ducts.

Technical Information

Key information about equipment we have installed.

bla bla bla: 1231231

bla bla bla: 1231231

bla bla bla: 1231231

bla bla bla: 1231231

On-time delivery

It is a source of pride to have been selected for this project, which contributes to making it more sustainable and nature-friendly.

Other Case Studies

Over 70 Completed Projects

Assembling and Installation is carried out by our qualified and experienced specialists and this fact guarantees assembly quality and on time commissioning.